Talk about planetary reducer installation recommendations
2014-12-01 22:06:00 clicks:The installation method:
(1) a little rust preventive oil onto the motor output shaft, flange
(2) if the sleeve is put in the reducer input shaft, attention must be paid on the sleeveand the groove reducer input shaft groove on the alignment.
(3) to be installed in the motor, placed on the platform, and the motor output axisupward, and then the motor is fixed, and the key to remove.
(4) small festival will be key groove groove alignment motor reducer input shaft on theslowly slide.
(5) the reducer input shaft is fixed with screws, the first torsion lock.
(6) fixed screw locking motor and reducer.
(7) the average successive (three) increase the torque will force reducer shaft on both sides of the fixed screw locking.
(8) do not gravity knocking speed reducer output shaft speed reducer, avoiding damage to internal organs.